| Lesson Plan | |
| Name of Faculty : Will Be Assigned | |
| Discipline : B.TECH (ME) | |
| Semester : 7TH | |
| Subject & Subject Code : REFRIGERATION & AIR CONDITIONING LAB & ME-411-F | |
| Lesson Plan Duration : 15 Weeks (from July, 2018 to November, 2018) | |
| Work Load (Practical ) per week (in hours) : Practical-4 | |
| Practical | |
| Practical Day | Topic |
| 1st -G1 | To study the vapour compression Refrigeration System and determine its C.O.P. and draw P-H and T-S diagrams |
| 1st –G2 | |
| 2nd-G1 | To Study the Mechanical heat pump and find its C.O.P. |
| 2nd-G2 | |
| 3rd-G1 | To study the Air and Water heat pump and find its C.O.P. |
| 3rd-G2 | |
| 4th-G1 | To study the cut- sectional models of Reciprocating and Rotary Refrigerant compressor. |
| 4th-G2 | |
| 5th-G1 | To study the various controls used in Refrigerating & Air Conditioning systems. |
| 5th-G2 | |
| 6th-G1 | To study the Ice- plant, its working cycle and determine its C.O.P and capacity. |
| 6th-G2 | |
| 7th-G1 | To study the humidification, heating, cooling and dehumidification processes and plot them on Psychrometric charts. |
| 7th-G2 | |
| 8th-G1 | To determine the By-pass factor of Heating & Cooling coils and plot them on Psychrometric charts on different inlet conditions. |
| 8th-G2 | |
| 9th-G1 | To determine sensible heat factor of Air on re-circulated air-conditioning set up. |
| 9th-G2 | |
| 10th-G1 | To study the chilling plant and its working cycle. |
| 10th-G2 | |
