| LESSION PLAN | ||
| NAME OF FACULTY : WILL BE ASSIGNED | ||
| DISCIPLINE : Civil Engg. | ||
| SEMESTER/SUBJECT /CODE : 7th/Ground Water Engg/CE-453-F | ||
| LESSION PLAN DURATION : 15 Weeks ( JULY 2018 TO NOVEMBER 2018) | ||
| WORK LOAD(LECTURE /PRACTICALS) PER WEEK : 03 Lecture , 01 Tutoral | ||
| week | Lec. day | Topic |
| 1st | 1 | Section A Introduction Ground water engg. |
| 2 | properties of acquifers , formation of costants | |
| 3 | Compressibility of acquifers ,Equation of motion for steady ground water flow | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 2nd | 1 | Unconfined flow with a reacharge tile drain problem |
| 2 | Dupits equation | |
| 3 | Ground water exploration | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 3rd | 1 | Section B Effect of boundaries |
| 2 | leaky aquifers, Thiem`s equilibrium formula for unconfined acquifer | |
| 3 | leaky aquifers, Thiem`s equilibrium formula for confined acquifers | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 4th | 1 | tube well types, parts, bore hole, strains, its types |
| 2 | determination of hydraulic properties of aquifers. | |
| 3 | Partial penetration of an aquifer by a well, | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 5th | 1 | spherical flow in a well |
| 2 | design aquifer | |
| 3 | spherical flow in a well | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 6th | 1 | Section C Tube wells, optimum capacity |
| 2 | silting of tube well, design of tube wells in different aquifers | |
| 3 | well pipe ,casing pipe,blind pipe | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 7th | 1 | Construction and working of tube wells |
| 2 | rivers Rotary Method | |
| 3 | types of aquifer | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 8th | 1 | site selection, drilling operation |
| 2 | cable tool method | |
| 3 | hydraulic method, | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 9th | 1 | well screen assembly installation |
| 2 | failure of tube well | |
| 3 | Construction and working of tube wells | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 10th | 1 | drilling fluids |
| 2 | verticality and alignment of tube wells gravel packing | |
| 3 | development of tube wells, sickness, in | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 11th | 1 | opening in slab |
| 2 | ground water maintanace | |
| 3 | design of non-rectangular slab | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 12th | 1 | considerations and methods |
| 2 | Section D Introduction to ground water recharge | |
| 3 | Artificial recharge of ground water | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 13th | 1 | recharge techniques |
| 2 | design example | |
| 3 | water spreading, | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 14th | 1 | modification of natural channels |
| 2 | irrigation, recharge pits, shafts and recharge wells. | |
| 3 | flooding,basin | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |
| 15th | 1 | Pumping equipment and hydraulic testing of pumps. |
| 2 | pumping system of ground water | |
| 3 | types of tube well | |
| Tutorial | Tutorial Class Work Based On Lecture /Numericals | |